Stairs on concrete and construction for self-assembly

Next to other products our company offers beautiful stairs of the highest quality which will certainly prove useful in almost every house or space. We manufacture the staircases according to individual dimensions provided by the customers, thanks to which they will fit into any interior.

The steps are made of carefully selected, 100% solid wood which provides optimal resistance to abrasion, cracking or other damage. Depending on the client's expectations, the steps can be either raw, polished and ready for painting or colorless (clear) varnished. For those who prefer other solutions, we recommend models stained in many different colors.

The steps we offer are designed for self-assembly and made by hand according to individual orders. It is possible to order all the elements (treads, risers, linings, outer strings, etc.) necessary for self-assembly on concrete or metal construction or any other.

What makes us different?

Parapety - wykończenie

We cut to your size specifications

Parapety - wykończenie

We use
the best design software

Parapety - wykończenie

We offer professional advice

Parapety - wykończenie

Shipping by courier

Order form

Manufacturing of a product ideally suited to your needs is our priority. In order to make our work more efficient, we have prepared a clearly structured form, thanks to which you will place an order in a few moments, and we will know your preferences and requirements. We kindly ask you to read carefully all the points and descriptions of the separate options.

A thoroughly completed form will help us to avoid misunderstandings and it will contribute to a faster implementation of the order.

The form is for valuation purposes only

1 Address details

2 Delivery and payment



3 Edges and corners

Schody - wykończenie

The top and bottom edges of the steps are finished by default, please let us know if your wish it to be different.

Comments

4 Material


Schody - wykończenie
Schody - wykończenie
Schody - wykończenie

5 Painting


6 The way of mounting the steps

Stopnie - montaż

Such steps have nicely finished the upper surface and the visible edges.
The remaining elements, i.e. the bottom of the tread and the edges at the wall, may have small cracks, knots or inaccurate grinding. The bottom of the tread has foam channels which improve the fixing quality.

Stopnie - montaż

Such steps have nicely finished both sides and all the edges.

7 Dimensions of finished treads

In the table below, please specify dimensions of straight treads and of the platform (from the perspective of climbing up the stairs).
In the comments, please specify rounded edges.

Stopnie - montaż
No. Finish Length [cm] Width [cm] Thickness [cm] Number of pieces Comments
1.

Please specify below the size of a riser groove as well as a LED channel and inform us if the treads are to have foam channels.
For pricing purposes, please specify the number of winders. Approximate dimensions are sufficient for the valuation. In case of implementation of the order we may ask you for hard cardboard templates or exact dimensions on the basis of which we will make the templates ourselves.
If you would like us to suggest the outlets, please contact us by e-mail.

Comments

8 Dimensions of finished risers

No. Length [cm] Width [cm] Thickness [cm] Number of pieces Comments
1.

Comments

9 L-shaped and U-shaped steps

10 Platform

11 Stair skirting

Stopnie - listwy
Stopnie - listwy
Stopnie - listwy
Stopnie - listwy
Stopnie - listwy

Milling of tread edges and skirting

Comments

12 Skirting strips sold per linear metre

Stopnie - listwy
mb
Stopnie - listwy
mb
Stopnie - listwy
mb
Stopnie - listwy
mb

13 Staircase balustrade


Please specify whether the staircase should be equipped with a balustrade along the whole length of the stairs.

Model of the balustrade

Dimensions of balusters
and posts as well as the shape of handrail can be discussed individually.

Stopnie - balustrada

14 Additional railing


Please specify if additional railing will be needed, e.g. on the upper floor where the stairs will end. (Please specify the number of running meters of additional balustrade in notes.)

Stopnie - balustrada

Comments

 

Attachments

 




Design and implementation of the website: itband.pl